Today the concrete form guys were here. Overall they did a decent job. Ah, who am I kidding. The did a crappy job on every aspect of the form.
- They left the 6" raised section off about 6' over to the side. Talk about looking terrible. I had to call Roger (my Shasta supervisor) about this one. I felt bad about calling his cell phone, but I can't trust Tina to give him the message. Roger said he would be here in the AM to approve the pour, so he could take a look at the incorrectly formed sections.
- They didn't form the swing pad, even though they edged it with the pick axes.
- The barbeque pad was much larger that agreed upon. This one I was obviously ok with. :)
- The firepit pad wasn't formed correct. It was about half as big as agreed upon.
- For some reason they require 6" between pads. When I requested the new decking to be added, I wanted it added adjacent to the current deck. I'm not sure why this is happening, but I think the space between the pads my just grow on me.
- So much for my newly installed sprinkler system. Even though all my sprinkler lines were at least 6"-8" underground, they found a way to break every one that was near where they were creating the new decks. 3 of them total, which is the whole southern half of our backyard.